Email: manager@richpacking.cn, WhatsApp / Wechat : +86-13826093596


Details

Home  > NEWS  > Industry News > Details

Maintenance of coating machine

Published:2018-10-23Author:Sources:Views:1267

Maintenance of coating machine

 

 

Guangdong Rich Packing coating machine machine lubrication

The bearing, worm and wheel in the reducer are lubricated by splashing type. The upper bearing is lubricated with a grease cup, which should be filled regularly. The reducer is changed to oil every half year, HL20 is used in winter, HL30 is used in summer, zg-2 calcium base grease is used in rolling bearings.

Installation and commissioning

1. After the machine is in place, it must be stable and fixed with anchor bolts.

2. Open the oil filling cover and add lubricant to the reducer to the oil mark.

3. When the power is switched on, pay attention to its phase sequence and make the sugar pan rotate clockwise.

4. Pay attention to the noise of the machine during the test run, so as to stop the machine in time for inspection.

5, sugar pot Angle related to the load and material properties, icing pan tilt Angle of 30 °, the production efficiency and quality are good.

Operating procedures

1. Carefully check whether the fasteners of all parts of the machine are loose before operation.

2. Clean the pan inside and outside of the icing machine.

3. Start the main motor and idle the machine for 2 minutes, so as to judge the fault free.

4. After feeding, press the main motor to press the button first, and then press the blower to press the button according to the crystallization of sugar. At the same time, switch on the electric heating wire.

maintenance

1. The lubricating oil in the reducer should be replaced regularly as required.

2. When the sugar-coated pan is not used for a long time, it should be cleaned and covered with a dustproof cover.

3, in order to ensure the reduction in the lubricating condition of worm gear and worm drive, the movement when the casing temperature rise shall not exceed 50 .

4. The sealing ring at the end of the worm shaft shall be inspected and replaced regularly, generally not more than 6 months.

5, the machine must be reliable grounding, the machine is in place, is outside of the electrical box a zero line connected, the grounding resistance should be 4 or less Ω (grounding line and zero line do not mistaken).

Guangdong Rich Packing professional production coating machine, if you need to contact us.


您好,是时候升级你的浏览器了!你正在使用 Internet Explorer 的过期版本,Internet Explorer 8 可以为你提供更快、更安全的浏览体验,提供更好的隐私保护。立即下载