Email: manager@richpacking.cn, WhatsApp / Wechat : +86-13826093596


Details

Home  > NEWS  > Industry News > Details

Introduction of Standard operating rules for Aluminium plastic Bubble cover packing Machine

Published:2018-05-23Author:Sources:Views:1359

Introduction of Standard operating rules for Aluminium plastic Bubble cover packing Machine


1. Preparation work before operation of aluminum plastic bubble cover packing machine

1.1 check the machine components, power, gas, water, etc.

1.2 get PVC and aluminum foil corresponding to the intermediate products.

1.3 with steel particles corresponding to the batch number of the intermediate product and affix a double layer tape under the mould to avoid crushing PVC and aluminum foil. Article link: China Pharmaceutical Network 

2. Operation of Aluminium plastic Bubble cover packing Machine 

2.1 dial the power switch and open the water supply valve

2.2 by pressing the preheating switch and the heater switch, the PVC heating roller (adjusted to 155-160 ℃), the aluminum foil heating roller (adjusted to 185-190 ℃) and the batch number steel word heating 120-130 ℃, respectively 
2.3 install PVC and aluminum foil in the prescribed direction, and make the name of aluminum foil consistent with the direction of batch number, attach PVC around the heating roller to the forming roll, and finally join the aluminum foil in the aluminum foil heating roller. 

2.4 When the temperature reaches the predetermined temperature, the main engine turns PVC clockwise around the PVC heating roller, hopper, aluminum foil heating roller, tensioning wheel, batch number device, punching die. 

2.5 press the "press, punch, vacuum, batch number" key and start switch, the machine rotates to check that the punched aluminum and plastic products meet the requirements, and the batch steel font should be in the same direction as the font on the aluminum foil, If the opposite can be changed aluminum foil or batch steel word direction.

2.6 check aluminum plastic mesh, batch number is clear, aluminum plastic compaction is flat, punching is complete, batch number is perforated and other external inspection.

2.7 after the inspection meets the requirements, the machine runs normally, put down the hopper, and add the sifted qualified intermediate product.

2.8 open the discharge valve, adjust the feeding speed in accordance with the speed of the machine, press the "brush wheel" switch, adjust the normal speed, in order not to affect the quality of the intermediate product; 

2.9 the normal operation of the machine, start the production operation; 

2.10 production process must always check the appearance of aluminum plastic finished products, machine operation, if abnormal immediately stop inspection, normal before production; 

2.11 after the end of production, according to the general stop switch, close the cooling water. 


Tags:
您好,是时候升级你的浏览器了!你正在使用 Internet Explorer 的过期版本,Internet Explorer 8 可以为你提供更快、更安全的浏览体验,提供更好的隐私保护。立即下载